2023 2024 FIRST BAPTIST CHURCH OF WAHIAWA 2023 PROPERTY AND SPACE BUILDING PROJECT ASSESSMENT CHECKLIST All highlighted have been completed by Dec. 2023. For additional work done, see list below. CHURCH Hand railing at the fellowship hall. Replace gutters at the back Rose st. side Stage/Altar ceiling crack Flower room needs cleaning. Japanese classroom needs cleaning. Change carpet at the pastor’s office. Change the carpet center aisle. Altar hand railing. Fix altar floor holes. EDUCATION BUILDING Painting 3rd floor classroom for youth room wall and floor and finishing the classroom next to it. Wood repair on the 2nd and 3rd floor stairway walls on the far side of the building. Roof top leak. CHURCH GROUNDS Ask the neighbor to cut the tree by the trash bin area. PARSONAGE RING Camera installation Tangerine tree trimming after the rainy days. Lychee tree trimming in Summer Back door jamb replacement (termite) Trim Hibiscus plant to not touch the house wall. Cut the pine tree in the ...